A high risk of load-shedding still remains
JOBURG – Eskoms says the power system still remains vulnerable and constrained.
Eskom has said the power system still remains tight, after load-shedding ended earlier today (8 November) at 5am.
The power utility implemented Stage 2 load-shedding on the evening of 7 November from 10pm even though they previously stated that load-shedding was not planned for the day. In a recent statement, the entity said the power system remains extremely constrained and vulnerable. “The overnight load-shedding assisted with partial recovery of our emergency resources to enable us to get through the morning.”
Eskom said their main objective is to not implement load-shedding during the day but due to the unplanned breakdowns that are above 10 500 MV and the need to replenish emergency services, the likelihood of load-shedding still remains high into the evening.
Their technical teams are working on returning units from planned and unplanned maintenance.
Related articles:
https://midrandreporter.co.za/228447/system-remains-constrained-no-load-shedding-today-eskom/
https://midrandreporter.co.za/228029/probability-load-shedding-low-electricity-system-remains-severely-constrained/